Q. 214.1( 9 Votes )

2 men and 7 boys can do a piece of work in 4 days. The same work is done in 3 days by 4 men and 4 boys. How long would it take one man and one boy to do it?

Answer :

To find: Time taken by one boy and 1 man.


Explanation:


Let the number of days in which 1 man and 1 boy can do the work be ‘a’ and ‘b’ respectively.


In 1 day,


In a days 1 man can work


In 1 day 1/a man can do work


2 men can do work in 2/a days.


Similarly


In b days 1 boy can work


In 1 day 1/b boy can do work


7 boys can do work in 7/b days


Given, 2 men and 7 boys can do a piece of work in 4 days. The same work is done in 3 days by 4 men and 4 boys.




Multiplying eq1 by 2 and subtracting eq2 from eq1







b = 60 days


Substitute the value of b in eq.2 to get,







a = 15 days


Thus 1 man can do work in 15 days and 1 boy can do work in 60 days.


Rate this question :

How useful is this solution?
We strive to provide quality solutions. Please rate us to serve you better.
Related Videos
Pair of Linear Equations in Two Variables46 mins
Dealing With the Real Life Problems53 mins
Learn to Solve Real Life Problems Using Linear Equations in Two Variables36 mins
Quiz | Real Life Problems Through Linear Equations56 mins
Quiz | Solution of Linear Equations53 mins
Champ Quiz | Consistency and Inconsistency of Solutions36 mins
Emphasizing on Elimination Method48 mins
Consistent and Inconsistent Equations33 mins
Elimination (quicker than quickest)44 mins
Algebraic Methods to Solve Pair of Linear Equation44 mins
Try our Mini CourseMaster Important Topics in 7 DaysLearn from IITians, NITians, Doctors & Academic Experts
Dedicated counsellor for each student
24X7 Doubt Resolution
Daily Report Card
Detailed Performance Evaluation
view all courses